Renovation Cost Guide Singapore
Honest 2026 cost ranges for HDB, BTO, condo and landed renovations - line by line, with no hidden carpentry, hardware or stone upgrades.
REQUEST AN ITEMISED QUOTEIn Singapore, most renovation quotes hide carcass material, hardware brand and stone grade behind a single lump sum. MRETTY publishes line items - so when one quote is S$30,000 lower than another, you can see exactly which corner was cut.

HDB & BTO Cost Ranges
3-room HDB whole-home: S$40,000 - S$65,000. 4-room HDB or BTO: S$55,000 - S$95,000. 5-room HDB or executive: S$70,000 - S$120,000. Ranges include hacking, electrical, full custom carpentry in E0 plywood with Blum hardware, quartz worktops and feature walls. Defects rectification included.

Condo & EC Cost Ranges
2-bedroom condo: S$60,000 - S$110,000. 3-bedroom condo: S$85,000 - S$160,000. 4-bedroom or penthouse: from S$160,000. Singapore condo pricing should include MCST permit fees, lift booking deposits and after-hours surcharges - we list these upfront so the quote you sign is the price you pay.

Landed Cost Ranges
Inter-terrace interiors: S$180,000 - S$350,000. Semi-detached: S$250,000 - S$500,000. Bungalow / GCB: from S$400,000. We separate the architect's structural scope from the interior carpentry scope so each line is auditable.

See A Real Singapore Quote
Walk through a completed Singapore home and the actual material, hardware and finish lines that built it - the level of detail you should expect from any renovation quote.
VIEW CASE STUDY →Cost Questions, Answered
Why is one Singapore renovation quote 30% cheaper than another?+
Usually carcass material (particleboard vs E0 plywood), hardware brand (generic vs Blum/Hettich), stone grade (engineered vs natural) or how defects rectification is treated. Ask for a line-itemised quote - any contractor who refuses is hiding margin.
Do MRETTY quotes change after signing?+
No - unless you request a scope change. Our quote locks material spec, hardware brand and finish before signing. Variation orders are issued only with your written approval and a fresh line item.
What payment schedule is standard in Singapore?+
A typical Singapore renovation runs 10% on signing, 40% on hacking start, 40% on carpentry installation, 10% on handover and defects clearance. CaseTrust-style milestone payments protect both sides.
Get An Itemised Quote
Share your floorplan and scope - we will return a line-by-line Singapore quote within 48 hours, with every material, hardware brand and finish named.
REQUEST A QUOTE